Notice: La función WP_Scripts::localize ha sido llamada de forma incorrecta. El parámetro $l10n debe ser un array. Para pasar datos arbitrarios a los scripts, usa en su lugar la función wp_add_inline_script(). Por favor, ve depuración en WordPress para más información. (Este mensaje fue añadido en la versión 5.7.0). in /home/u330299341/domains/neosuccess-project.eu/public_html/wp-includes/functions.php on line 6078

Recent Comments

    UpStream unit is starting-up!

    By Enrique L Mozos 2 años ago
    Home  /  News  /  UpStream unit is starting-up!

    The Up Stream Process (USP) sub-unit is now completed and starting-up!

    After months of hard work, the USP installation is very close to start working. IVEM is now testing the sub-unit to make sure there are no faults and iron it out. That means making sure that valves open and close properly, looking for leackages in the system and fixing them, testing the pumps, verifying that the sensors work, checking the control system (SCADA), etc. Once it has being refined, IVEM plans to run some preliminary tests in order to get familiar with the sub-unit before the official 20 batches.

    Video: Checking water access valves and deposit level sensors in the Nutrients Tank.

    In the meantime, Down Stream Process (DSP) is in a good path. In fact, the installer has been visiting today the facilities to get a better picture of the area and to coordinate with the USP on some topics.

    It will not be long before we announce the first tests!

    Stay tuned!

    Category:
      News
    this post was shared 0 times
     100
    About

     Enrique L Mozos

      (47 articles)